As of April 2026, KleanTu® has installed over 270 NitROE® WWTS with flow rates ranging from 220 gallons per day (gpd) in single-family residential settings to 18,260 gpd for combined flows from a cluster system that serves apartment buildings and townhomes. The NitROE® WWTS have been installed on Martha’s Vineyard (MV), Nantucket, Cape Cod (Cape) and the South Shore of Massachusetts. Additional NitROE® units are in design phase for other regions of Massachusetts and the New England area.

Current installations include the following towns:

  • Aquinnah – MV
  • Barnstable – Cape
  • Bourne – Cape
  • Chilmark – MV
  • Edgartown – MV
  • Falmouth – Cape
  • Mashpee – Cape
  • Nantucket
  • Oak Bluffs – MV
  • Plymouth – Off Cape/South Shore
  • Sandwich – Cape
  • Tisbury – MV
  • Truro – Cape
  • Wellfleet – Cape
  • West Tisbury – MV
  • Yarmouth – Cape

KleanTu®’s NitROE® WWTS is listed on the Massachusetts Department of Environmental Protection’s Best Available Nitrogen Reducing Technologies (BANRT) list under a provisional permit. KleanTu® expects to obtain General Use approval in 2026. KleanTu® has collaborated with the following Massachusetts organizations during the pilot through provisional permit stages to develop, optimize and implement the technology at certain locations.  The NitROE® units are currently being installed under a provisional permit from the Massachusetts DEP:

  • Massachusetts Alternative Septic System Test Center (MASSTC)
  • Town of Tisbury, MA
  • Barnstable Clean Water Coalition (BCWC)
  • Massachusetts Clean Energy Center (MassCEC)
  • Island Housing Trust (IHT), Martha’s Vineyard
  • Buzzards Bay Coalition (BBC)
  • Boards of Health for various municipalities and other Martha’s Vineyard/Cape Cod organizations

Shubael Pond Innovative and Alternative Septic System Project

KleanTu® is currently working with the BCWC to install multiple NitROE® systems in the Shubael Pond area of Marstons Mills, MA to improve water quality around the neighborhood.  The BCWC highlighted the NitROE® project in their Fall 2021 newsletter and in this video.

Tisbury

Tisbury, Individual Home – 550 GPD Design Flowrate System installed in December 2018

West Falmouth

West Falmouth, College Light Opera Company Campus – 6,000 GPD Design Flowrate System installed in May 2020

Tisbury

Tisbury, New Installation for Two Residential Units – 1,000 GPD Flowrate System installed in June 2020

Tisbury

Tisbury, Current Installation in Progress, Affordable Housing Units – 4,400 GPD Design Flowrate System installed in December 2021